Calculator · Build and rehab

Construction draw schedule calculator

Track a construction loan line by line. Enter budgets, change orders, amounts billed and inspected progress to see retainage, what is left to draw, any equity gap and which lines run ahead of the work. Results update as you type.

Loan
Percent held back from each draw until completion.
Percentage points a line may be drawn ahead of inspected progress.
Draw status
A fee is charged on each.
Gross of pending draws.
Line 1: Permits and fees
Can be negative.
Line 2: Demolition and site prep
Can be negative.
Line 3: Foundation and concrete
Can be negative.
Line 4: Framing and lumber
Can be negative.
Line 5: Roofing
Can be negative.
Line 6: Windows and doors
Can be negative.
Line 7: Plumbing rough and finish
Can be negative.
Line 8: Electrical
Can be negative.
Line 9: HVAC
Can be negative.
Line 10: Insulation and drywall
Can be negative.
Line 11: Kitchen cabinets and counters
Can be negative.
Line 12: Flooring and paint
Can be negative.
Line 13: Landscaping and cleanup
Can be negative.
Line 14: Contingency
Can be negative.

Results

Updates as you type. The formulas are under "How this is calculated" below.

Revised construction budget
Percent of budget billed
Weighted inspected % complete
Loan still available to draw
Equity gap
All lender checks

Draws

Billed to date (all draws)
Funded draws, gross
Retainage held on funded draws
Fees on funded draws
Funded draws, net received
Budget remaining to bill
Percent of loan funded
Budget above the loan (cash you must bring)

Lender checks

Lines drawn ahead of work
Lines over budget
Billed exceeds loan commitment
Loan left plus equity short of cost to complete

By line item

1. Permits and fees
budget, drawn, left, ,
2. Demolition and site prep
budget, drawn, left, ,
3. Foundation and concrete
budget, drawn, left, ,
4. Framing and lumber
budget, drawn, left, ,
5. Roofing
budget, drawn, left, ,
6. Windows and doors
budget, drawn, left, ,
7. Plumbing rough and finish
budget, drawn, left, ,
8. Electrical
budget, drawn, left, ,
9. HVAC
budget, drawn, left, ,
10. Insulation and drywall
budget, drawn, left, ,
11. Kitchen cabinets and counters
budget, drawn, left, ,
12. Flooring and paint
budget, drawn, left, ,
13. Landscaping and cleanup
budget, drawn, left, ,
14. Contingency
budget, drawn, left, ,

How to use this calculator

  1. Enter the loan amount, the retainage percent, the fee per draw and the borrower equity. Your loan agreement has these terms.
  2. For each of the 14 lines, enter the original budget, any change orders (use a negative number for a cut) and the amount billed so far.
  3. Enter the inspected percent complete for each line, from the inspector's report. Use 0 for work not started.
  4. Enter how many draws have been funded and how much is billed but not yet funded.
  5. Read the summary: revised budget, percent billed, loan still available and any equity gap.
  6. Check the lender checks and the by-line list for lines drawn ahead of the work or over budget.

Worked example

The page opens on a $151,000 construction loan with 10% retainage, a $150 fee per draw, 5 points of tolerance and $40,000 of borrower equity. Three draws are funded and $16,500 is billed but pending.

How this is calculated
  1. Revised budget per line = original budget + change orders. The total revised budget is the sum of all lines.
  2. Funded gross = billed to date - pending. Retainage held = funded gross x retainage %. Fees = fee per draw x number of funded draws.
  3. Net received = funded gross - retainage held - fees.
  4. Remaining to bill = revised budget - billed. Percent billed = billed / revised budget.
  5. Weighted inspected % complete = sum of (revised budget x inspected %) / total revised budget.
  6. Loan still available = loan - funded gross (not below 0). Budget above the loan = revised budget - loan (not below 0). Equity gap = max(0, budget above loan - equity).
  7. A line is drawn ahead when its % drawn is more than its inspected % plus the tolerance. A line is over budget when billed exceeds its revised budget. Lines with a revised budget of 0 are skipped.
  8. The status shows OK when no line is ahead or over, billed does not exceed the loan, and loan left plus equity covers the cost to complete.

A simplified view. The spreadsheet version tracks each draw with dates, sign-off and days to inspect. Your lender's own checks and rules decide what is actually funded.

Frequently asked questions

What is retainage on a construction loan?

It is a percentage of each draw held back until the work is finished or approved. The percent and release rules come from your loan or contract, so check your documents.

What does it mean to draw ahead of the work?

It means more has been billed on a line than the inspector says is done. Lenders usually watch for this because the money should follow completed work. A small tolerance is common, but terms vary.

How does a construction draw work?

The contractor or borrower bills for completed work, the lender usually has it inspected, then funds the draw, often minus retainage and fees. The details differ by lender.

What is the equity gap?

It is the part of the revised budget that the loan does not cover and your contributed equity does not cover either. If it is above zero, you may need more cash or a larger loan to finish.

Why do change orders matter?

They raise or cut a line's budget. Added change orders can push the total over the loan amount, which creates an equity gap even though the original plan fit.